Barooga Riverbank Remediation | In8
Contact us at info@in8.pro | Serving Councils across NSW & QLD

Barooga Riverbank Remediation

Riverbank stabilisation and remediation works for Berrigan Shire Council, improving erosion control, asset protection and environmental resilience along the Murray River frontage.

Innate Project Solutions (In8) delivered project management and delivery support for riverbank remediation works at Barooga, NSW. The project addressed ongoing erosion risks and asset exposure through stabilisation works delivered within a sensitive environmental and community setting, requiring careful coordination, environmental management and staged construction.

Barooga Riverbank Remediation – image 1 Barooga Riverbank Remediation – image 2 Barooga Riverbank Remediation – image 3

Project Overview

Client: Berrigan Shire Council  |  Contract Value: $365k  |  Completed: September 2025  |  Role: Full lifecycle project management from mid-procurement to practical completion, including design coordination, construction surveillance, environmental and quality assurance.

Project Delivery

In8 provided full lifecycle project management services, commencing with prerequisite documentation, environmental planning and design coordination before progressing through procurement support, construction delivery and close-out.

The project was delivered adjacent to the Murray River within a public and environmentally sensitive setting, requiring careful staging, strong environmental controls and disciplined construction oversight to manage erosion risks while maintaining public safety and environmental integrity.

Scope of Works

  • Preparation and management of prerequisite documentation and approvals
  • Design coordination and constructability review with Council and design consultants
  • Procurement support and contractor engagement
  • Environmental management planning and regulatory compliance oversight
  • Construction staging to manage public access and environmental constraints
  • Riverbank stabilisation and erosion control works
  • Installation of remediation measures to protect riverbank assets and adjacent infrastructure
  • Construction surveillance and quality assurance inspections
  • WHS, environmental and quality compliance management
  • Contract administration including progress claims, variations and reporting
  • As-built documentation, Practical Completion and handover

Environmental Management, Surveillance & QA

  • Implemented and monitored environmental controls to protect water quality, vegetation and riverbank areas.
  • Provided regular site surveillance to verify works were delivered in accordance with approved designs, specifications and environmental requirements.
  • Managed quality assurance processes to confirm materials, installation methods and completed works met project and regulatory standards.
  • Coordinated inspections, defect rectification and final sign-off leading to Practical Completion.

Outcomes

The Barooga Riverbank Remediation Project has improved erosion control and long-term stability of the riverbank, reducing risk to Council assets and public areas while enhancing environmental resilience.

In8’s proactive and disciplined management approach ensured the project was delivered safely, in full compliance with environmental requirements and with minimal disruption to the surrounding community.

CONTACT

In8.pro – Innate Project Solutions
Email: info@in8.pro
Phone: +61 400 880 780
Address: 49 Napier Street, Deniliquin NSW 2710
Services across NSW, QLD and Eastern Australia.

Discuss a remediation project

Contact us to discuss how we can support erosion control, remediation and environmentally sensitive works through disciplined project management, surveillance and assurance.